Direct answer
Why this matters
Single-sourced packaging is a continuity risk; qualifying a backup after a failure can take months.
Build the backup around the current package
Start with the controlled specification, current artwork files, an approved physical sample, order history by SKU, ship-to points, and the equipment the package must run on. A supplier name is not a second source until the alternate package has been qualified against the same requirements.
- Name the owner of technical and commercial approval.
- Separate shared requirements from SKU-specific artwork and dimensions.
- Write down when the backup would actually need to supply.
Use a risk-scaled qualification path
Decide what document review, samples, trials, and release approval the alternate needs. The consequence of failure should determine the depth of qualification.
Boundary: An emergency does not make an unapproved material, structure, artwork, or machine condition safe to skip.
Use the next worksheet
The Second-Source Readiness Checklist helps carry the known information into a consistent next step. It does not certify technical suitability or guarantee pricing.