Direct answer
Why this matters
A single point of failure in packaging can halt production; continuity planning protects the line.
Map failure modes around the program
List events that could interrupt supply: material availability, capacity, artwork or specification change, quality hold, transportation, forecast error, or a single approved source. Record the warning, owner, containment action, and recovery path for each.
- Inventory and consumption.
- Normal replenishment and approval timing.
- Alternate material, site, or supplier status.
- Decision rights during a shortage.
Test the plan before the emergency
Confirm files and samples are retrievable, contacts are current, alternates understand the requirement, and approvers know their role.
Boundary: Buffers and alternates have commercial and technical tradeoffs; size them to the actual risk.
Use the next worksheet
The Second-Source Readiness Checklist helps carry the known information into a consistent next step. It does not certify technical suitability or guarantee pricing.
Related work
See something that needs correcting? Tell Matt.